Roadside Vegetation Removal | Corner Wharf Street and Island Point Road
Proposed Dates
Between Tuesday 7 October and Friday 10 October (works will take place on one day within this period, weather permitting).
Working Hours
Approximately 7:00am – 5:00pm.
Scope of Works
- Removal of two large African Tulip trees and one medium-sized Umbrella tree.
- Stump grinding approximately 500 mm in from the gutter, from the water tank access downhill around to the golden canes.
- Use of an excavator to remove waste material and batter back the bank, creating a safer pedestrian space on the corner.
- The surface will be left graded to gutter height.
Traffic Management
- External traffic control will be in place for the duration of works.
- Single-lane operation with intermittent traffic holds during tree dismantling.
Duration
The works are expected to be completed within one (1) day.
We thank you for your patience and cooperation while these important safety works are carried out.
Enquiries
If you have any questions or concerns, please contact Liza Dowling via email liza.dowling@douglas.qld.gov.au or call 0419 840 215.

