Council requires the licensed plumbing contractor to provide an as-constructed drainage plan to the Council Plumbing Inspector at the sanitary drain inspection.
The as-constructed plan is to indicate the sewer connection details and all in-ground sanitary drainage plus the location of the water meter and in-ground water service to the point of entry.
The as-constructed plan must be drawn on the Douglas Shire Council template provided here and can be either A4 or A3 size.
Failure to provide the as-constructed drainage plan at the sanitary drain inspection or to the required standard may result in the inspection being failed and further charges applied.
As-constructed drawings can be provided by completing a Land Records Search Form and paying the relevant fee.